INSTALLATION MADE CRAZILY

30 September 2019

As people say – “the customer is the king”, so there is no use to be bothered with assembly guidelines prepared by the manufacturer since the pace of the execution of the investment project forces us to assemble the gate or even install the automatics when the hall does not even exist yet. It looks amazing, the skeleton of the structure and only the industrial VERDOOR gate with the control unit and drive installed. Colloquially speaking, it was an assembly made crazily, but time – or rather lack of it – was crucial for the investor. Nobody felt like taking up such a task. By dint of co-operation of the whole team of the VERDOOR people, the time from ordering for manufacturing until the end of the assembly was 8 days! You must admit that such an execution in the top September season was a real challenge for the manufacturing department and internal service teams. As a souvenir, we are taking a few photos from Anin located in the vicinity of Warsaw, where the warehouse of dental materials will be operating soon. All in all, it is understandable that when people suffer from toothache, you must be in hurry!